The large building at 305 South Congress, where Austin's daily newspaper was once printed, became a battery factory in the fall of 2025. Base Power moved in on a lease the Austin American-Statesman described as a temporary 18 to 24 months, according to the paper's October 2025 report. Endeavor's plan for the 18.9-acre site calls for six high-rises and a waterfront park. For now the site holds a production line.
The gap between what has been approved on Bouldin Creek's north edge and what is actually being built matters to anyone buying here. Rail construction on South Congress is scheduled first, then one tower on the lake with its own park and boardwalk. The Statesman park, the largest public piece, comes last. A buyer closing this winter is paying for the construction years first, and the October numbers show the market currently leaves room to negotiate on that.
Spring 2027: the plan that replaces the waterfront rules
The district never got the regulations it was designed around. Zoning updates meant to turn the 2016 South Central Waterfront vision into requirements were shelved indefinitely before a September 2024 Council vote, Community Impact reported in January. Since then, projects have been approved one at a time. On March 26, 2026, City Council voted to dissolve the South Central Waterfront Advisory Board.
The money is gone as well. A tax reinvestment zone created in late 2022 would have set aside a share of rising property tax revenue in the district for roads and parkland. The Austin Monitor reported in April 2024 that a Travis County judge had blocked its proposed $354 million in financing. Community Impact's January account says the zone was shut down before any of its funds were used.
The waterfront is now part of the city's Central City District Plan, which extends downtown's planning boundary south across the lake. According to the city's plan page, the plan goes to Council in late spring 2027. Until a vote, whatever the district gets in parks and streets beyond each project's own commitments is undecided.
2027: rail work on South Congress
Austin Light Rail's first phase runs south on South Congress and east along Riverside. It crosses Lady Bird Lake on a new bridge with a path for people on foot and on bikes. On February 18, the Austin Transit Partnership board approved a $60 million design-build contract with Austin Rail Constructors, a joint venture of Stacy Witbeck and Sundt Construction. ATP CEO Greg Canally told Community Impact that construction is on track to begin in 2027. ATP's April 2026 status report said the contractor had started field investigations and was coordinating with utilities to find conflicts and plan any relocations.
The system will open with 15 stations, and trains will run every 5 to 10 minutes for most of the day. Its total cost is $7.1 billion, and federal grants are expected to cover about half. KUT reported in July that no federal grant had been awarded yet and that ATP expected to hear about federal funding only after construction starts in 2027.
For a Bouldin Creek address, this means the first visible part of rail is a work zone on South Congress. The trains come later. In January 2025, the Austin Monitor reported that ATP expects property values near stations to rise. That was the transit agency's projection at the draft stage. Nothing has been measured yet, and any increase would show up after the construction years.
East Austin is facing its own construction years ahead of the parks planned over I-35.
Q1 2028: the one tower actually going up
One Lady Bird Lake is the project that exists in steel and glass. It sits between South First Street and South Congress Avenue on 235 feet of waterfront. It is an 18-story tower designed by KPF and developed by Related Companies with Christopher Investment Company and Wheelock Street Capital. The building has 101 condominiums, from one to four bedrooms, and a scheduled completion in the first quarter of 2028, according to Related's October 29 sales announcement. On November 9, KXAN reported another 197 rental units in the building and an exterior more than halfway finished.
Related's release also promises a public lakeside park and a future boardwalk extension that reaches the water's edge, both connecting to the Ann and Roy Butler Hike-and-Bike Trail. The ground floor is planned for restaurants opening toward the trail. For anyone whose routine already includes the Butler Trail loops from 78704, this is the public piece attached to a building already more than halfway clad.
After that: projects paced by demand
Two blocks east, Related's 500 South Congress on the former Ego's site was approved by Council on September 11, 2025, for 950 homes, a 225-room hotel, offices and commercial space. It could rise as high as 650 feet. In January, Related Texas President Mike Iannacone told Community Impact it would be the heart of the waterfront district. Other approvals are lined up behind it. A 488-residence tower at 311–315 South Congress was approved November 7, 2024. An Endeavor proposal for a 510-foot residential tower at 600 East Riverside, the Cidercade site, was still in early city review in September 2025. The city's One Texas Center at 505 Barton Springs Road may also be redeveloped.
The Statesman site holds the district's biggest public promise. Endeavor's project FAQ describes six buildings with 1,378 homes, 275 hotel rooms, about 1.5 million square feet of office space, and a 6.53-acre waterfront park dedicated to the city. The parkland transfers in phases as the buildings next to it receive certificates of occupancy. The FAQ expects three construction phases over 12 to 15 years, with timing set by market demand. The city's PUD exhibit adds a protected cycle track on a Barton Springs Road extension that connects directly to the Butler Trail.
The latest status report on the site came in February, when the Statesman wrote that Base Power was planning a permanent 486,000-square-foot plant at 8001 Metropolis Drive and that the waterfront redevelopment was stalled by multiple lawsuits. Because the park is tied to buildings, and the buildings are tied to demand, the largest public green space on Bouldin Creek's doorstep is the item furthest out on the calendar.
What October's numbers say about buying ahead of it
The market a buyer faces this week does not reflect the waterfront yet. In Community Impact's nine-ZIP Central Austin area, which includes 78704, there were 146 closings in October 2026, down 17.5% from October 2025. The median price was $825,000, down from $894,000 a year earlier. Average days on market fell from 78 to 62 over the same period. For the City of Austin as a whole, the October 2026 median was $550,000, with 5.7 months of inventory, KXAN reported from Unlock MLS data. The Travis Central Appraisal District put the average change in county single-family market values at a 1.8% decline for 2026, measured as of January 1.
Taken together, these figures describe a central Austin market with fewer sales and softer prices. The homes that are well priced are selling faster than they did a year ago. That is room to negotiate, and it comes at the start of a known stretch of disruption. A home bought in Bouldin Creek this winter will be owned through the 2027 start of rail construction on South Congress and One Lady Bird Lake's scheduled completion in early 2028. The Statesman parkland follows on a timeline set by demand. The houses closest to Riverside and South Congress will feel each of these first. The streets deeper in, toward Oltorf, are further from the work zones and also further from what replaces them.
FAQ
Is anything on the Statesman site under construction? The most recent report, from the Statesman in February 2026, described the building as Base Power's temporary factory, with redevelopment stalled by lawsuits. Endeavor's plan calls for three phases over 12 to 15 years.
When does light rail construction start near Bouldin Creek? ATP has said construction begins in 2027. The Phase 1 route runs south on South Congress and east along Riverside.
What is the first new public space on this part of the lake? Related has promised a public lakeside park and a boardwalk extension at One Lady Bird Lake, a building scheduled for completion in the first quarter of 2028.
If you're weighing a Bouldin Creek home against what's coming along Riverside and South Congress, The Davis Agency can walk the streets with you and price a specific address against that timeline. Start with a home valuation and consultation, or read our buyer's guide before you tour.